Cherryland Electric Repair Garage

Project Type:

An 8,086 SF addition to an existing garage building, consisting of vehicular storage, vehicle repair, office, toilet and storage mezzanine. Our design scope included domestic plumbing, compressed air system, in-floor heating, snow melt system, heating, ventilation, air conditioning, lighting, and power distribution.


Environment Architects

Start Date:

November 2015

Finish Date:

October 2016